Filtering by: “BSU-1B”

Feb
13

BSU ALL Power Interruption

## Affected ###

— All @ BSU

### Because ###

— Due to a prolonged power outage caused by the city utilities of Bad Salzuflen, both servers and distribution points were affected. However, everything is now back to normal.

### Status ###

https://stats.uptimerobot.com/XQpoAtlLp

https://status-bsu.jgnet.eu/status/bsu

### Help ###

https://www.bsbengine.net/helpdesk

View Event →
Jan
26
to Jan 27

GLO-Hypervisor Changes

## Affected ###

— GLO (Global)

### Because ###

— We need to replace VMware with a new hypervisor as the company behind VMware is deemed untrustworthy. We do not believe that the partnership between Broadcom and VMware provides a secure future.

### Status ###

https://stats.uptimerobot.com/XQpoAtlLp

### Help ###

https://www.bsbengine.net/helpdesk

View Event →
Jan
1

BSU-HEL-FRK Service Update

## Affected ###

— BSU-1A

— BSU-1B

— FRK-1A

— FRK-2A

— TS3 Server Global

— Statistic Server

### Because ###

— We have updated numerous services and background services to enable our upcoming major updates. All services should be back up and running as usual at the end of the day.

### Status ###

https://stats.uptimerobot.com/XQpoAtlLp

### Help ###

https://www.bsbengine.net/helpdesk

View Event →
Dec
8

BSU Gateway Reconfigurations

## Affected ###

— BSU-1A

— BSU-1B

— ISP Login Network

### Because ###

— We are in the process of configuring settings for the upcoming changes slated for the year 2024. This adjustment aims to streamline several services, allowing us to readily offer enhanced services right from the beginning of the year.

### Status ###

https://stats.uptimerobot.com/XQpoAtlLp

### Help ###

https://www.bsbengine.net/helpdesk

View Event →
Nov
17
to Nov 18

BSU-1A + BSU-1B Power equipment reconfiguration

## Affected ###

— BSU-1A

— BSU-1B

### Because ###

We have made significant changes to our power supply equipment and had to take Availability Zone 1A and 1B in BSU offline for a while. The work has been successfully completed, and normal operations have been restored

### Status ###

https://stats.uptimerobot.com/XQpoAtlLp

### Help ###

https://www.bsbengine.net/helpdesk

View Event →
Jun
8
to Jun 9

BSU-1A, BSU-1B, BSU-2A and VLO-1A slow Connections

## Affected ###

— BSU-1A

— BSU-1B

— BSU-2A

— VLO-1A

### Because ###

The Telekom AG is currently experiencing disruptions that are affecting our infrastructure as well. Since we have multiple partners, our network is only experiencing anomalies and not a complete outage. However, it is possible that pages may take longer to load than usual. The internet speed is also affected and is on average 60% slower than normal.

### Status ###

https://stats.uptimerobot.com/XQpoAtlLp

### Help ###

https://www.bsbengine.net/helpdesk

View Event →